Isidora
|
 |

The information on this website should be read in connection with Rusoro Mining's news release dated March 14, 2012 which addresses the Nationalization of Rusoro's Venezuelan mining assets by the Bolivarian Republic of Venezuela ("Venezuela") government and the subsequent news release dated August 22, 2016 announcing the award (the "Award") issued on August 22, 2016 by the Arbitration Tribunal ("Tribunal").
For a copy of the Award, please click here.
Isidora Exploration
The Isidora Project is located within the Block B group of concessions within the El Callao Gold Mining District. The Isidora deposit which is comprised of four sub-parallel veins, remains open along strike and down dip.
Previous drilling has totalled more than 200 drill holes and an additional 26,168m were drilled in 62 holes in 2009. Two diamond drill rigs are continuing to drill and the program is designed to expand the current resources and reserves.
A series of additional targets have been outlined within the BlockB Project by previous work. Geological, geochemical, and geophysical anomalies as well as numerous old mine workings provide excellent potential for the discovery of new gold mineralized zones and extensions to known structures.
|